Recently, attentive Shanghai residents may notice that some equipment boards have been added to the outside of the sound barrier on the Tongren section of the south side of the Yan 'an Elevated Road.
Turns out, this is a solar photovoltaic panel. For the first time, Shencheng elevated Viaduct attempted to install clean energy equipment on the sound barrier on a pilot basis, contributing to energy conservation, emission reduction, green and low-carbon.
It is reported that since the beginning of this summer, the continuous high temperature weather in Shanghai has led to a sharp increase in production and living electricity, and the city's electricity load has hit a record high.
Distributed photovoltaic power generation can effectively relieve the power supply pressure of power grid, reduce the carbon emissions of electricity used in production, and supplement clean energy.
Market has led the guodian shipping center Shanghai branch to carry out the "pilot" photovoltaic installation work, selection of yanan elevated as the first batch of pilot, and recently completed the installation of equipment, the pilot yanan elevated road is located in tongren road, involved a total of photovoltaic rods 2 groups, the flexible solar panel 3 groups (30), in the form of photovoltaic power generation in full access to the Internet.
The pilot adopts the mode of photovoltaic power rod + flexible solar panel. Among them, the flexible solar panel can be directly installed on the upper part of the sound barrier by using the characteristics of flexible components that can be bent, which can match the curved part of the sound barrier, and the overall appearance is better combined; Solar panels are lightweight and can be fixed in a variety of ways, including by sticking them.
At the same time, all surfaces of photovoltaic modules are sprayed with photocatalyst nanomaterials, with self-cleaning function, which is convenient for subsequent cleaning and maintenance. Photovoltaic rods can be installed relying on the gantry structure of transportation facilities.
At present, the photovoltaic of Yan 'an elevated pilot section has been installed and successfully connected to the grid. In the next step, the city road Transport Center will continue to select some sections of the inner ring elevated road for the second batch of exploration and pilot, vigorously develop renewable energy, and achieve the goal of green and low-carbon energy transformation and dual carbon in the transportation field.